Description
Two (2) 30,000 CFM AHUs with thermal break construction.
Location
University of Delaware
Challenge
Aggressive lead time with high-end performance. The design conditions were challenging for these laboratory applications.
Solution
⦁ Flex Air utilized their 3″ thermal break construction to prevent exterior condensation.
⦁ Also included a thermally broken base rail and intermediates.
⦁ All of the electrical was factory installed for reduced site installation time.
⦁ Delivered tight tolerance on humidity and filtration/air quality.
⦁ Glycol loop for energy recovery.