Project

Electric Vehicle Charging Substation

Categories

Modular Electric,

Client

General Motors

Description

Battery Charging Sub-Station.

Location

GM Proving Grounds – Yuma, Arizona

Challenge

Due to the lead time of the electrical equipment, we needed to complete the substation within 4 weeks of gear arrival to our facility, which would allow the contractor to turn the project over to GM within 6 weeks.

Solution

⦁ Flex Air designed and engineered a modular enclosure for the gear.
⦁ The enclosure was ready on the manufacturing floor when the gear arrived.
⦁ Shipped a turnkey building within 4 weeks of receiving gear.

×
img

    Contact Form

    Get In Touch

    Contact Info