Sofie Theranostics Center of Excellence
A 2700 sqft. custom mechanical platform and penthouse with an integrated chilled water system, hot water system, compressed air, steam, general and lab HVAC air handlers. Location Totowa, New Jersey Challenge Integrate all mechanical and electrical systems with limited building interference while expediting the construction schedule. Solution ⦁ Fully integrated off-site modular construction. ⦁ Reduced […]
Allegheny Health
42,500 CFM hospital-grade AHU with matched architectural building siding. Location Jefferson Hills, PA Challenge Design and Build a custom AHU for exterior design to blend with the existing building. Solution ⦁ Standard construct design allowed for any number of architect siding to be factory mounted with minimal cost or lead time impact. ⦁ Custom siding […]
GE Aerospace
A custom AHU with integrated desiccant for de-humification, complete piping (gas and water), and complete electrical (high and low voltage including PLC controls). Location Mishawaka, New York Solution ⦁ One (1) 18,000 CFM – HVAC unit for paint process application with integrated desiccant dehumidification. ⦁ AHU and vestibule all in one. ⦁ All mechanical and […]
West Virginia University
A 30,000 CFM hospital-grade indoor AHU. Location West Virginia University Challenge The hospital was looking to replace operating room AHU with little downtime. Solution ⦁ Custom shipping splits to allow the sections to be moved through the hallways and elevators, including splits down the length of the AHU. ⦁ Complete assembly (did not have to […]
GM Ramos Arizpe Plant
42 Air Handlers, 2.2 million CFM with outdoor packaged heating and cooling units (industrial grade) mounted on roof curb or on steel grillage for manufacturing plant areas. Location Ramos, Mexico Solution ⦁ An engineered common solution to simplify production to meet the project schedule. ⦁ Worked with preferred control contractors and other vendors.
FCA WS/WL MACK
A total of 3.3 Million CFM – (53) AHU for a large-scale new paint shop building. Designing efficient and effective filtering and conditioning for paint process. Location Detroit Challenge Size and scope of the project with an aggressive project schedule. Solution ⦁ Design and deliver AHU for the first large-scale paint shop. ⦁ Worked closely […]
Ford Mobile Charging
You will find yourself working that result partnership in an incredible Experience, and an end products that is the best.
GM Ultium Cells LLC
You will find yourself working that result partnership in an incredible Experience, and an end products that is the best.
Ford Boiler
A 300 Horsepower steam boiler plant for automotive manufacturer application. Location Windsor, Canada Challenge The company needed a vendor to expedite delivery and install of a new boiler plant to replace aging infrastructure. The entire project timeline was accelerated. Solution ⦁ Flex Air was contracted to finish/complete the design of the steam plant and source […]
GM Electric Vehicle Charging Substation
Battery Charging Sub-Station. Location GM Proving Grounds – Yuma, Arizona Challenge Due to the lead time of the electrical equipment, we needed to complete the substation within 4 weeks of gear arrival to our facility, which would allow the contractor to turn the project over to GM within 6 weeks. Solution ⦁ Flex Air designed […]